IMGpapers 1976–79

Newspapers of the International Marxist Group and its forerunners, 1976–79

Lucas lock out

Socialist Challenge No. 8, 28 July 1977 · p. 4 of the scan · 334 words

The scan: sc-n08-jul-28-1977.pdf (PDF, Marxists Internet Archive, opens at this page)

Uncorrected machine reading. This text was read by machine (Apple Vision OCR) from a scan of a newspaper page, and the page was cut into articles by machine, at the headlines found by their type size. Nothing has been corrected: expect misread words, text from a neighbouring article, and titles that are the machine reading of the headline, some of them only fragments. Quote from the scan, not from this page.
How this article was cut and titled: headline found by type size in the OCR geometry (split_tabloid.py); 3-4 of 7; machine-segmented newspaper page; uncorrected Vision OCR.

page 4 of the scan

THE LOLA DUE BE LUCAM Birmingham which is due to start oil E Augusl ts the culmination ol a campaiga of provocation carried ou hs manasement. Toolmakers in the company's planis are in trom dispule over n bonus system.

of thi trade pniem side of the Natieanl Solot Negntiglion Commhțec he will be doing tis ICrEI OTI C SUE 1 10 The beginnings of the which cume op the sreme to the last atrike wase in Fords wat Tave so deownu:

re Füll cirim. Ne Junking of hie cost bE tivin Reduce motking withodi lois of pay- fir w LSAEE TCCS PAES Phase 2.

ASILACLS E8 ranke CRUCE-DEE DR saleguard.

Hepk 9TS and has been approved by th CO BIOJICUE HE But management have rS TASTET saruied to at he separe oi - UCDaREI Employmen io Birmingham has nationa backing ruied that the claim is outside August A work to rule in support of the CN eL TO THAN CLOL SUSECId ing all bonas payments for toal Workers found their wage packets short by up to sumuner.

Unite for Action

Both these struggles challenge Phase 2 directly. By forming an Indestry-wide block, the Leyland toolroom workers are following the same tactics as the dockers, uniting workers who would otherwise be split from each other, some making claims under Plese 3, others under Phase 2. But there are dangers as well.

The car industry promises to be the first place where the bosses following the CBl directive to hold the line are going to stand firm. The wave of disputes in the engineering Industry in the spring and the clear signs of a repcat performance in the autama point to the need for a national lead for all engineering workers.

The first step would be the calling of a National Broad Lefl conference, organised on a democratie basis, with the sim of uniting all those in the union pledged to a fight against the twelre month rule aed theten per cent norm.

← Ford claim goes inRank and file reject Jones circular →

Something wrong on this page?